Shut Down Inspection / API Inspection

API 510 Plant Shut Down Inspection: Visual Inspection & Ultrasonic Thickness Gauging of Pressure Vessels (Filter & Vertical Air Receiver), Inspection and Rerating (2018)

ClientFuture Prelude Sdn Bhd 

API 510 Pressure Vessel In-service Inspection of Cooker and Cooler (2015)

ClientMalaysia Milk Sdn. Bhd. (Malaysia)

Inspection and failure analysis of a fire tube boiler in PT Asia Cocoa Indonesia (Batam, Indonesia) (Jan 2015)

ClientPT Asia Cocoa Indonesia 

API 570 Piping In-service Inspection for Flexible jumper at CENDOR-MOPU Platform (2014)

ClientPetrofac (Malaysia)

API 570 Piping In-service Inspection for Flexible hoses and risers at West Desaru MOPU and WSS Platforms (2014) 

ClientPetrofac (Malaysia)

NDE Ultrasonic Thickness Gauging Measurement on Total 11 units for a Vitamin Plant (2014)

ClientKL-Kepong Oleomas Plant (Malaysia) 

API 510 Pressure Vessel In-service Inspection at NEWFIELD Alfa Belumut Platform (2013)

ClientNEWFIELD Alfa Belumut Platform, Kerteh (Malaysia) 

API-510 Pressure Vessel Inspection & API-570 Piping Inspection (including CUI inspection) (August 2013)

ClientTanjung Bin Power Plant, Malakoff Malaysia 

API-510 Pressure Vessel Inspection (Inspection of Methyl Ester Condenser/Heat exchanger) (July 2013)

ClientLereno Sdn. Bhd., Malaysia 

API-510 Pressure Vessel Inspection & API-570 Piping Inspection (including Corrosion Under Insulation inspection) at Yetagun Platforms [December 2011, Jan 2012, May 2012, September 2012, March 2013, July & August 2013]

ClientPETRONAS CARIGALI (Myanmar) 

Onshore CAT1 Bridge and Telecom masts Inspection by rope access (2010 & 2012)

ClientMoattama Gas Transportation Company Ltd. & Total E&P, Myanmar

Eddy current Inspection on crane structures on offshore platforms of Total E&P, Myanmar (TEPM Offshore, Yadana Field) (2011)

ClientTotal E&P, Myanmar

Inspection of Pressure Vessels (Total: 80 pressure vessels) during Power Plant shut down at Kapar Power Station

ClientKapar Energy, Malaysia

Piping system Baseline thickness gauging at offshore platforms of Total E&P, Myanmar (TEPM Offshore, Yadana Field) (low points and with rope access) (2011)

ClientTotal E&P, Myanmar

API-510 Pressure Vessel In-service Inspection & API-570 Piping Inspection at Yetagun Platforms, Petronas Carigali (Myanmar) (2010)

ClientPETRONAS CARIGALI (Myanmar)

Inspection of steam boiler at Mensilin Holding, Malaysia

ClientMensilin Holding, Malaysia

ECT & MPI inspections with Rope Assess and Painting Inspection with Rope Access at MCP Platform (TEPM Offshore, Yadana Field) for TOTAL E&P Myanmar (2010)

ClientTOTAL E&P Myanmar

Shutdown Inspection of Pressure Equipment for Saint Joseph Facility (offshore) of Sabah Shell Petroleum Co. Ltd. 

ClientSabah Shell Petroleum Co. Ltd. (Malaysia)

In-Service Inspection of Pressure Vessel and Dryer Cylinder at Malaysian Newsprint Industries, Mentakap, Malaysia

ClientMalaysian Newsprint Industries, Mentakap, Malaysia

Inspection of Hydrogen Tanks of Air Products STB Sdn. Bhd., Malaysia

ClientAir Products STB Sdn. Bhd., Malaysia

API-510 Pressure Vessel In-service Inspection & API-570 Piping Inspection (Baseline Inspection) at Yetagun Platforms, Petronas Carigali (Myanmar) (2009 - 2010)

ClientPETRONAS CARIGALI (Myanmar)